Polypropylene non woven geotextile fabric price 110gsm
Geotextile- PET PP nonwoven Geotextile
Part one: Description of non woven geotextile
Made from PP(polypropylene) or PET(polyester) fiber by nonwoven needle punched manufacturing process. It has function of isolation, filtration, drainage, reinforcement, protection and maintenance etc.
Part Two: The Specification of non woven geotextile
Weight |
100g/m2-600g/m2 |
Length |
50m/roll,100m/roll,150m/roll or as your choice |
Width |
2.0m-8.0m or as your choice |
Color |
White/Black mainly White |
Material |
PET, PP |
Delivery port |
Qingdao |
Package: |
woven bag or as customers' requests |
Product time |
2-20 days |
Note |
We can do as your demand, please feel free to contact us for more information |
Part Three: The Application of non woven geotextile
1 Separation
The isolation of the railway dregs and the roadbed, roadbed and the soft base, surface of the airdrome and parking lot and the groundsill, different dam materials. It isolates the soil and the gravel of two kinds different
granule pathway from the groundsill or other buildings.
2 Reinforcement
The highway, railway, soil-stone dam, breakwater, airport, backfill soil of retaining wall, slope protection, etc in which distributes the earth stress, prevents the side-displacement of the earth body and improves the earthbody stability.
3 Protection
It prevents the bank from being washed out, protects the bank and the
bottom, prevents the water and soil from being washed away
Part Four: Certification
SO9001:2000 International Quality System Certification,
ISO14001:2004 Environment Management System Certification GB/T28001:2001 Vocational Health and Safety System Certification.
Part Five: Other information
Shipping:
7 days after receive the advance payment
Services
1.We can provide free factory similar sample and delivery charge at your side |
2.We can make sample with your design proposal at your cost. we can provide matched die-cutting document for your designing use in advance. |
3.The sample can be ready right after we have discussed the processing details and confirm your payment for it in 4-7 work days. it may be extension for some special or complicate ones. |